【實用工具app】OBD Trouble Code Lookup Lite|最夯免費app

【實用工具app】OBD Trouble Code Lookup Lite|最夯免費app

分享好友

【免費工具App】OBD Trouble Code Lookup Lite-APP點子

Now featuring over 14,000 OBD1 and OBDII ECU fault codes in the full-version!!!

The perfect addition to OBD and OBD2 diagnostic tools that don't give you information on the DTC. Now you can find out exactly why your check engine light is on in your car.

This is the lite version. of OBD 2 trouble code Lookup. It provides 1,300 generic trouble codes (P0XXX, B0XXX, C0XXX, U0XXX). The full-version features over 14,000 generic and manufacturer-specific (EOBD2) Power-train (P1XXX,P2XXX), Chassis(C1XXX), Network(U1XXX), and Body(B1XXX) codes for

Supported manufacturers below:

Acura

Audi

Alfa Romeo

BMW

Eagle

Citroen

Daewoo

Chrysler/Dodge/Jeep

【免費工具App】OBD Trouble Code Lookup Lite-APP點子

Fiat

Ford

Geo

GM/Chevy/Buick/Cadillac

Honda

Hummer

Hyundai

Infiniti

Isuzu

【免費工具App】OBD Trouble Code Lookup Lite-APP點子

Jaguar

Kia

Land Rover

Lexus

Mazda

Mercury

BMW Mini

Mitsubishi

Nissan

【免費工具App】OBD Trouble Code Lookup Lite-APP點子

Pontiac

Porsche

Peugeot

Plymouth

Saab

Saturn

Scion

Smart.

Subaru

【免費工具App】OBD Trouble Code Lookup Lite-APP點子

Suzuki

Toyota

Volkswagen

Volvo

OBD, OBD I, OBD II, OBD 1, OBD 2, On Board Diagnostics, check engine light, Trouble codes, error codes, engine torque.

This app does not connect to any ELM Bluetooth devices, and is best used in conjunction with inexpensive diagnostic meters that do not provide trouble code definitions. Now you'll know exactly why the check engine light is on in your car, and what the OBDII DTC means.

Disclaimer: All information is provided “as is” without warranty of any kind, either expressed or implied.

【免費工具App】OBD Trouble Code Lookup Lite-APP點子

免費玩OBD Trouble Code Lookup Lite APP玩免費

免費玩OBD Trouble Code Lookup Lite App

OBD Trouble Code Lookup Lite APP LOGO

OBD Trouble Code Lookup Lite LOGO-APP點子

OBD Trouble Code Lookup Lite APP QRCode

OBD Trouble Code Lookup Lite QRCode-APP點子
熱門國家系統支援版本費用APP評分上架日期更新日期
未知Android
Google Play
84
App下載
免費
1970-01-012015-04-21
分享app
上一個APP
下一個APP

高評價工具App推薦