【實用運動app】Old Xaverians Soccer Club|最夯免費app

【實用運動app】Old Xaverians Soccer Club|最夯免費app

分享好友

【免費運動App】Old Xaverians Soccer Club-APP點子

The Old Xaverians Soccer Club (OXSC) was established in 2002 to meet the ever-increasing demand from past students of Xavier College to continue with competitive soccer. The Steering Committee including Peter De Luca, Jamie McCormack, James Nicholls, John Ubaldi, Peter Clyne and Phil Barcellona met in November 2001 and established the basis from which the club emerged.

The OXSC was born in the tradition of other prominent Old Xaverian sporting clubs, based on the intrinsic values of integrity, goodwill and fair-play.

The club is proud of the links it has forged. The OXSC is a valued member of the Old Xaverian Association and the Associated Old Boys Soccer Association. The Club is also supported by the Xavier College administration, the Xavier Soccer Committee and prominent members of the Victorian soccer community.

During this time the club has come up with some fantastic ideas and innovative plans to ensure the strength of the club continues long in to the future.

One of the main areas the club was looking to improve on was the way in which it was currently communicating with its players, members, supporters and sponsors.

With a forward thinking and a dynamic board the club was actively pursuing different methods which would enable them to improve on their existing communication channels.

After conducting a review of all the options available to them the club is pleased to announce the release of their first ever native mobile phone app for Android.

The app will be branded in the famous red, black and white of the Old Xaverians Soccer Club and the content available to users in the app will contain information about the club.

No longer will you have to worry about missing out on news or information about the Old Xaverians Soccer Club as the app will serve as your number one source of information about the club!

The type of information available to you when you download this app are as follows:

- Latest News

- Results

- Images

- Videos

【免費運動App】Old Xaverians Soccer Club-APP點子

- Events

- Facebook

- Merchandise

- Committee

【免費運動App】Old Xaverians Soccer Club-APP點子

- Contacts

- Teams

- Ladders

- Fixtures

【免費運動App】Old Xaverians Soccer Club-APP點子

- Team news

- Sponsors

- Grounds

- Memberships

【免費運動App】Old Xaverians Soccer Club-APP點子

- Training and much much more

To make sure you stay in touch with absolutely everything to do with the club, download the app now!

Go Xavs!

【免費運動App】Old Xaverians Soccer Club-APP點子

免費玩Old Xaverians Soccer Club APP玩免費

免費玩Old Xaverians Soccer Club App

Old Xaverians Soccer Club APP LOGO

Old Xaverians Soccer Club LOGO-APP點子

Old Xaverians Soccer Club APP QRCode

Old Xaverians Soccer Club QRCode-APP點子
熱門國家系統支援版本費用APP評分上架日期更新日期
未知Android
Google Play
1.2
App下載
免費
1970-01-012015-02-04
  • Old Xaverians Soccer Club
  • 分享app
    上一個APP
    下一個APP

    高評價運動App推薦

    MUT 25

    Version 2.2 - Fixed Collection Slowness and added Back Button CompatibilityVersion 2.1 - Fixed Console Selection on Registration.Version 2.0 Updates:• …
    LaMichael James

    LaMichael James’ Free and Official App. Now you can keep up to speed with the professional football running back and former Oregon Duck directly on yo …